Wieland Metals, Inc.

A 10,000-SF vertical expansion, including infrastructure and process piping for a new production line. Construction was completed while the facility was fully operational.

HydraForce | Phase II

Phase II of the HydraForce project included an interior office build-out, a new parking lot with 201 spaces, site work, new electrical service, and production line MEP work – including a gas fired IT generator. Phase I was completed in 2013 – see project. 

Old St. Patrick’s | Rectory Renovation

Renovation of an existing 9,600-SF four-story rectory building and a 1,300-SF addition. The project increased the floor plate of the building and improved accessibility.  Renovations included intensive structural modifications requiring a multi-phase shoring of the existing structure and the creation of new openings in existing bearing walls. Accessibility improvements included a new elevator, new stairs, … Continued

Saints Faith, Hope & Charity | Parish Center

A 10,000-SF addition on the east side of the main church building featured an interior connection from the existing church lobby to the new Parish Center lobby. The project included new finishes in the church narthex and a new parking lot with underground detention. Brick, stone and aluminum-clad wood windows and a standing seam metal … Continued

North Suburban Synagogue

Renovation of the interior and exterior of the Harold and Rudy Blumberg Auditorium. This project was completed on a highly accelerated schedule to accommodate the Congregation’s operational requirements.

Madonna Della Strada Chapel at Loyola University

Complete renovation of a Chapel that opened its doors in 1939. The main goal of the project was to restore the interior to its original grandeur while allowing the Chapel to serve the needs of a modern University. The project featured Italian-marble floors, a dramatic lighting system, detailed plasterwork and ornamental iron, all of which … Continued

North Shore Congregation of Israel

A 7,000-SF renovation and addition which included new classrooms, a multi-purpose room and kitchen. In addition, the scope included a new outdoor amphitheater, elevator shaft, glass-enclosed stair tower and outdoor roof deck with pavers.

Patrick BMW Dealership

An addition and renovation of the Patrick Mini and BMW Sales and Service areas. This project included the addition of a two-story gallery and showroom preparation facility, complete with power washing and central vacuum system equipment. Locker, break, and conference rooms are located on the second floor.

Grossinger City Autoplex | Chicago

Conversion of a manufacturing facility into a full service dual point auto complex near North and Clybourn. Grossinger City Autoplex is a 310,000-SF, LEED® Silver project located in a Chicago Tax Increment Financing (TIF) district. The building was constructed to the lot lines, which left zero room for outdoor automobile inventory. Smart design and configuration … Continued